Case study from an underground mine showing how pre-splitting techniques were applied to production holes on the wings of secondary stopes to ensure that the wings are stable after blasting. The results showed that the methodology followed was successful since the wings remained stable after blasting as confirmed by the cavity monitoring system. The effectiveness of presplitting for wings stability was thus validated.
Follow the link to download.
Pre-splitting Application for Wings Stability in Secondary Stopes.